Please use this identifier to cite or link to this item:
http://hdl.handle.net/11189/8017| Title: | The electricity supply industry in the Democratic Republic of the Congo | Authors: | Lukamba-Muhiya, JM Uken, Ernst |
Keywords: | Hydropower;Democratic Republic of Congo (DRC);electricity use;public private partnership | Issue Date: | 2006 | Publisher: | The Department of Chemical Engineering of the University of Cape Town | Source: | Lukamba-Muhiya, J.M. & Uken, E. 2006. The electricity supply industry in the Democratic Republic of the Congo. Journal of Energy in Southern Africa, 17(3): 21–28. [http://dx.doi.org/10.17159/2413-3051/2006/v17i3a3261] | Journal: | Journal of Energy in Southern Africa | Abstract: | The electricity supply industry of the Democratic Republic of Congo is reviewed, from the formation of the Societé National d’Electricité (SNEL) in 1970 until today. The DRC government established a national utility, because electricity is a key element in the socio -economic development of a country. Due to the national monopoly of SNEL, hydropower plants could be constructed such as Inga1 and Inga2. They supply power to mining in the Katanga province, and to a steel company in Maluku, not far from Kinshasa. Currently, Inga1 and Inga 2 are not operating at full capacity. Many hydropower and thermal plants are located in different provinces and need to be refurbished to increase their capacity of electricity for the DRC. Due to technical problems, SNEL only generates 1150 MW. The electrification programme in urban and rural areas across the DRC caters for less than 10% of the 60 million inhabitants. In 1980, the government implemented a policy called Plan Directeur de SNEL for electrification, but the policies never reached their objectives. No Energy White Paper exists which outlines the entire policy framework for energy supply and demand. Power sector reform has also not been implemented in the electricity sector. This paper outlines future government options in the electricity sector. Accordingly, the Public Private Partnership model could play a major role in attracting private partners to invest in the electricity sector in order to have different hydropower and thermal plants refurbished | URI: | http://hdl.handle.net/11189/8017 | ISSN: | 2413-3051 1021-447X |
DOI: | http://dx.doi.org/10.17159/2413-3051/2006/v17i3a3261 |
| Appears in Collections: | BUS - Journal Articles (DHET subsidised) |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| The electricity supply industry in the Democratic Republic of the Congo.pdf | Article | 296.07 kB | Adobe PDF | View/Open |
Page view(s)
121
Last Week
0
0
Last month
8
8
checked on Aug 13, 2026
Download(s)
177
checked on Aug 13, 2026
Google ScholarTM
Check
Altmetric
Items in Digital Knowledge are protected by copyright, with all rights reserved, unless otherwise indicated.