Please use this identifier to cite or link to this item: http://hdl.handle.net/11189/7840
DC FieldValueLanguage
dc.contributor.authorWentzel, Lanceen_US
dc.contributor.authorCrowe, Jonathanen_US
dc.contributor.authorNdihokubwayo, Rubenen_US
dc.date.accessioned2021-05-17T11:41:52Z-
dc.date.available2021-05-17T11:41:52Z-
dc.date.issued2010-
dc.identifier.citationWentzel, L., Crowe, J. & Ndihokubwayo, R. 2010. Improving workmanship in the low-cost housing sector by reintroducing the Artisan/Skilled Workers Trade Test of Yesteryear. (In: Proceedings of the 5th Built Environment Conference 18-20 July 2010, Durban, South Africa). [https://a8a7dd79-0644-457f-867f-0e48e5c7dee4.filesusr.com/ugd/ff96b9_bf9de701120241edab1387a793bcfa67.pdf]en_US
dc.identifier.isbn978-0-620-46703-2-
dc.identifier.urihttps://a8a7dd79-0644-457f-867f-0e48e5c7dee4.filesusr.com/ugd/ff96b9_bf9de701120241edab1387a793bcfa67.pdf-
dc.identifier.urihttp://hdl.handle.net/11189/7840-
dc.descriptionConference Proceedingen_US
dc.description.abstractPurpose This research study investigates the problems arising from poor workmanship in construction phases of low-cost housing projects, proposing solutions which can address and reduce these problems. Design/Methodology/Approach A literature study was done but, confined to factors influencing quality of workmanship including factors as time and cost in the low-cost housing sector. In addition to this a questionnaire survey was conducted on purposive Further Education Training (FET) Colleges, construction companies and a professional in the Built Environment based in the Western Cape regions. The respondents were chosen due to their continuous involvement in the low-cost housing sector. Findings It was revealed that there are limited skilled workers in the construction industry (low-cost housing) at present. Consequently time, cost and ultimately quality related goals are difficult to achieve. Findings suggest the necessity of trade test of yesteryear for skilled workers. Research Limitation/Implications The survey was completed on three FET Colleges and two construction/housing companies and a professional of the Built Environment. However, there were time and logistical constraints, for example meeting each role player at a certain time and certain place was not always possible. This played a huge role in completing two of the surveys. Practical Implications The research study brings fourth to the low-cost housing sector as well as the construction industry as a whole, that by increasing the percentage of skilled workers, goals such as time, cost and quality could be easily met. Originality/ Value The study illustrates that by implementing the trade test of yesteryear many problems experienced with poor workmanship in the low-cost housing sector, such as continued remedial works due to unskilled (makeshift) artisans will be eliminated thereby enhancing time, cost and quality goals.en_US
dc.language.isoenen_US
dc.publisherAssociation of Schools of Construction of Southern Africaen_US
dc.subjectCosten_US
dc.subjectLow-cost housingen_US
dc.subjectTimeen_US
dc.subjectTrade Testen_US
dc.subjectWorkmanshipen_US
dc.titleImproving workmanship in the low-cost housing sector by reintroducing the Artisan/Skilled Workers Trade Test of Yesteryearen_US
dc.relation.conferenceProceedings of the 5th Built Environment Conference, 18-20 July 2010, Durban, South Africaen_US
dc.typeOtheren_US
Appears in Collections:Eng - Conference Proceedings
Show simple item record

Page view(s)

88
Last Week
1
Last month
3
checked on Sep 2, 2026

Download(s)

41
checked on Sep 2, 2026

Google ScholarTM

Check


Items in Digital Knowledge are protected by copyright, with all rights reserved, unless otherwise indicated.