Please use this identifier to cite or link to this item: http://hdl.handle.net/11189/10665
Title: Practical approach to enhance energy resilience in manufacturing facilities
Authors: Ngongo, Prosper Kabasele 
Almaktoof, Ali 
Kahn, Mohamed Tariq Ekeramodien 
Keywords: Copper losses;Energy efficiency;Energy savings;Low voltage;Manufacturing facility;Medium voltage;Notified maximum demand;Time of use;Uninterruptible power supply
Issue Date: 2025
Publisher: Wiley Open Access
Source: Ngongo, P.K., Almaktoof, A M.A. & Kahn, M.T.E. 2025. Practical approach to enhance energy resilience in manufacturing facilities. Energy Science and Engineering, 13(2): 673-954. [https://doi.org/10.1002/ese3.2021]
Journal: Energy Science and Engineering 
Abstract: Both developed and developing countries are affected by the global energy problem. Over the last few decades, the industrial sector's electrical energy demand has grown exponentially, altering the supply-and-demand balance. The trend toward Industry 4.0 compliant production facilities necessitates a greater demand for high-reliability power. Because severe production losses caused by power outages cannot be tolerated, an increasing number of large vital industrial processes integrate centralized high-quality, online UPS technology onto their network to establish a grid-to-load link and continuously condition dirty electricity from the national grid. These facilities distribute electrical power using either an MV or LV system. Based on the integration design, investigating ways to quantify energy efficiency savings of MV versus LV UPS system is required. This paper proposes strategic and technical interventions for these systems and assesses their electrical losses and budgetary ramifications. The paper also aims to contribute to the implementation of an energy efficiency plan and help facilities close power efficiency gaps. From the results obtained, the MV UPS system offers a significant reduction in energy consumption. Compared to the LV UPS system, annual energy losses are reduced by 46% at a load factor of 65%. A significant energy improvement is expected at higher load factors and in larger facilities where longer distribution cables are used. Compared to the LV UPS system, MV UPS saves R221 509 per meter of cable length increase and R31 457 per percentage increase in load factor.
URI: http://hdl.handle.net/11189/10665
ISSN: 2050-0505 (Online)
DOI: https://doi.org/10.1002/ese3.2021
Appears in Collections:Eng - Journal articles (DHET subsidised)

Files in This Item:
File Description SizeFormat 
Practical_Approach_to_Enhance_Energy.pdf2.01 MBAdobe PDFView/Open
Show full item record

Page view(s)

22
checked on Aug 29, 2026

Download(s)

9
checked on Aug 29, 2026

Google ScholarTM

Check

Altmetric


Items in Digital Knowledge are protected by copyright, with all rights reserved, unless otherwise indicated.