Please use this identifier to cite or link to this item: http://hdl.handle.net/11189/3697
Title: Evaluation of site managers’ hindrances towards optimal utilisation of construction resources
Authors: Julius Ayodeji Fapohunda
Keywords: Construction management;Construction production processes;Project management;Resources utilisation;Site managers’ attributes;Site managers’ performance
Issue Date: 2014
Publisher: Emerald
Source: Julius Ayodeji Fapohunda , (2014),"Evaluation of site managers’ hindrances towards optimal utilisation of construction resources", Journal of Engineering, Design and Technology, Vol. 12 Iss 3 pp. 348 - 363 Permanent link to this document: http://dx.doi.org/10.1108/JEDT-03-2012-0013
Abstract: Purpose – The purpose of this paper is to delineate different types of site manager attributes that significantly contribute to construction project management efficiency and evaluate the factors that hinder the site manager during construction production processes. Towards efficient resources utilisation, site managers require various qualities and potentials. Design/methodology/approach – To achieve valid result, the research study was triangulated by exploring literature, which was augmented with both quantitative questionnaire and qualitative interview research methods. The research data were collected in the UK building industry. Findings – It was found that the barriers that often affect efficient utilisation of construction resources in the industry are poor communication, disagreement, misunderstandings, bad weather, union strikes and construction participants’ personality conflicts. This research study presents severity of site manager’s hindrances, factors that affect site manager’s efficiencies, solutions to minimise the hindrances on site manager’s efficient performance and factors that should be constant towards site mangers’ efficient performance. Among these solutions found evident that will enhance site managers’ performance and minimise the effect of the hindrances are an enhanced planning and adequate programming of construction resources before and during project execution, rational team building and an efficient construction team for project, in addition to adequate information dissemination and transfer of knowledge. Originality/value – The adequate implementation of the solutions presented in this paper will not only enhance the performance of site managers on resources utilisation but will also augment client satisfactions
Description: To cite this document: Julius Ayodeji Fapohunda , (2014),"Evaluation of site managers’ hindrances towards optimal utilisation of construction resources", Journal of Engineering, Design and Technology, Vol. 12 Iss 3 pp. 348 - 363 Permanent link to this document: http://dx.doi.org/10.1108/JEDT-03-2012-0013
URI: http://dx.doi.org/10.1108/JEDT-03-2012-0013
http://hdl.handle.net/11189/3697
Appears in Collections:Eng - Journal articles (DHET subsidised)

Files in This Item:
File Description SizeFormat 
Julius_Ayodeji_Fapohunda_Eng_2014.pdfMain Article456.19 kBAdobe PDFView/Open
Show full item record

Page view(s)

103
Last Week
0
Last month
0
checked on Feb 16, 2021

Download(s)

24
checked on Feb 16, 2021

Google ScholarTM

Check


This item is licensed under a Creative Commons License Creative Commons